Jenkintown Borough Welcomes the ‘Summit House Apartment’ Residents
The Jenkintown Recreation Board will be welcoming residents of the ‘Summit House Apartments’ to the Borough – please join other Borough residents at 7 p.m., Tuesday August 10th, on Town Square to enjoy the weather and the music of a favorite local band –“Tropical Disease.” Continue reading Welcome to Summit House Residents and Summer Music Series→
Due to the storms that the Borough experienced yesterday and last evening, Public Works has been working to clear roadways for emergency and non-emergency vehicles. Now that those tasks are under control the PW Dept. will be performing a special curbside collection of branches, limbs and leaves, tomorrow, Friday, July 23rd, 2021. Continue reading Special Storm Debris Collection Tomorrow, Friday, July 23rd→
The Borough was asked to Share this Exciting News!
The Hiway Theatre, Jenkintown Community Alliance & The Moving Picture Cinema are excited to host their 1st of 2 family-friendly outdoor summer movie events. They will be bringing their “Outdoor Cinema Series” to the top rear parking lot of the historic Strawbridge and Clothier building (now Outback Steakhouse) at 610 Old York Rd, Jenkintown, PA 19046.
Bring the whole family to their outdoor screening tomorrow, Friday July 23rd. “We’ll be watching E.T. The Extra-Terrestrial with our friends at the top of the garage at the Strawbridge Building”. Tickets are available right now at www.hiwaytheater.org
E.T. THE EXTRA-TERRESTRIAL
E.T. THE EXTRA-TERRESTRIAL is a film that has touched the hearts of generations of young moviegoers. Elliot, a lonely kid living in suburban California, comes across a shy alien in his backyard. Quickly the two develop a strong bond of friendship after Elliot decides to hide the alien, who he calls E.T.
The Borough has been notified by PECO’s subcontractor, Miller Bros., that there will be temporary road and lane closures beginning Monday, July 12, 2021. These road closures are to ensure the contractor’s safety installing underground electric utilities. The contractor indicated this project is expected to last approximately 4 to 6 weeks. The roads affected by the electrical installations are Mather Spur closed between Township Line Road and Mather Road from 7:00 A.M. until 3:00 P.M; Township Line Road will have lane closures between Washington Lane and Summit Avenue from 9:00 A.M. until 3:00 P.M.
Residents will continue to have access to their properties during this process. If you do not reside on this road please take another route during these times to avoid disruption of your travels.
If you have any further questions about this project please contact PECO at 610-832-6420. If you have an emergency dial 911.